Draft Fundraising Letter Block 2 (Q19855): Difference between revisions

From Semantic Lab
Jump to navigation Jump to search
(‎Created claim: block text (P19): PAGE TWO Our plans are as follows: 11 performances, from October 13 - 23, 1966. The Festival will be held at the Armory at Lexington Avenue and 25th Street, a marvelous space for our performances. The budget is $50,000, covering the cost of designing and building the technical equipment, production costs, rental of the Armory, lighting stage expenses, insurance fees and the like. We anticipate, Batch load by XXXXX to do XXXXX)
(‎Created claim: block text URL (P20): https://semlab.s3.amazonaws.com/texts/d51369277ed46ddeb3e714aa9f331702/2.txt, Batch load by XXXXX to do XXXXX)
Property / block text URL
 
Property / block text URL: https://semlab.s3.amazonaws.com/texts/d51369277ed46ddeb3e714aa9f331702/2.txt / rank
 
Normal rank

Revision as of 16:17, 21 May 2020

No description defined
Language Label Description Also known as
English
Draft Fundraising Letter Block 2
No description defined

    Statements

    0 references
    PAGE TWO Our plans are as follows: 11 performances, from October 13 - 23, 1966. The Festival will be held at the Armory at Lexington Avenue and 25th Street, a marvelous space for our performances. The budget is $50,000, covering the cost of designing and building the technical equipment, production costs, rental of the Armory, lighting stage expenses, insurance fees and the like. We anticipate
    0 references