Memo Block 2 (Q19859): Difference between revisions
Jump to navigation
Jump to search
(Created claim: instance of (P1): block (Q2013), Batch load by XXXXX to do XXXXX) |
(Created claim: local ID (P17): 2, Batch load by XXXXX to do XXXXX) |
||
(4 intermediate revisions by the same user not shown) | |||
Property / parent document | |||
Property / parent document: A203 9 Evenings memo / rank | |||
Normal rank | |||
Property / part of project | |||
Property / part of project: E.A.T. Knowledge Graph Project / rank | |||
Normal rank | |||
Property / block text | |||
We need the following information for the coordination of the ceiling and lighting. Would you please fill out the diagrams as directed and return them to us immediately (so we'll have them tomorrow). Ceiling Diagram Put a mark on the floor diagram corresponding to the location where an object is to hang or come from the ceiling. On an adjoining paper would you give a description of the objec | |||
Property / block text: We need the following information for the coordination of the ceiling and lighting. Would you please fill out the diagrams as directed and return them to us immediately (so we'll have them tomorrow). Ceiling Diagram Put a mark on the floor diagram corresponding to the location where an object is to hang or come from the ceiling. On an adjoining paper would you give a description of the objec / rank | |||
Normal rank | |||
Property / block text URL | |||
Property / block text URL: https://semlab.s3.amazonaws.com/texts/8bbb20c0ab23a2f1130a812a64eceae0/2.txt / rank | |||
Normal rank | |||
Property / local ID | |||
2 | |||
Property / local ID: 2 / rank | |||
Normal rank |
Latest revision as of 16:20, 21 May 2020
No description defined
Language | Label | Description | Also known as |
---|---|---|---|
English | Memo Block 2 |
No description defined |
Statements
We need the following information for the coordination of the ceiling and lighting. Would you please fill out the diagrams as directed and return them to us immediately (so we'll have them tomorrow). Ceiling Diagram Put a mark on the floor diagram corresponding to the location where an object is to hang or come from the ceiling. On an adjoining paper would you give a description of the objec
0 references
2
0 references