Draft Fundraising Letter Block 2 (Q19855): Difference between revisions
Jump to navigation
Jump to search
(Created claim: part of project (P11): E.A.T. Knowledge Graph Project (Q19104), Batch load by XXXXX to do XXXXX) |
(Created claim: block text (P19): PAGE TWO Our plans are as follows: 11 performances, from October 13 - 23, 1966. The Festival will be held at the Armory at Lexington Avenue and 25th Street, a marvelous space for our performances. The budget is $50,000, covering the cost of designing and building the technical equipment, production costs, rental of the Armory, lighting stage expenses, insurance fees and the like. We anticipate, Batch load by XXXXX to do XXXXX) |
||
Property / block text | |||
PAGE TWO Our plans are as follows: 11 performances, from October 13 - 23, 1966. The Festival will be held at the Armory at Lexington Avenue and 25th Street, a marvelous space for our performances. The budget is $50,000, covering the cost of designing and building the technical equipment, production costs, rental of the Armory, lighting stage expenses, insurance fees and the like. We anticipate | |||
Property / block text: PAGE TWO Our plans are as follows: 11 performances, from October 13 - 23, 1966. The Festival will be held at the Armory at Lexington Avenue and 25th Street, a marvelous space for our performances. The budget is $50,000, covering the cost of designing and building the technical equipment, production costs, rental of the Armory, lighting stage expenses, insurance fees and the like. We anticipate / rank | |||
Normal rank |
Revision as of 16:17, 21 May 2020
No description defined
Language | Label | Description | Also known as |
---|---|---|---|
English | Draft Fundraising Letter Block 2 |
No description defined |
Statements
PAGE TWO Our plans are as follows: 11 performances, from October 13 - 23, 1966. The Festival will be held at the Armory at Lexington Avenue and 25th Street, a marvelous space for our performances. The budget is $50,000, covering the cost of designing and building the technical equipment, production costs, rental of the Armory, lighting stage expenses, insurance fees and the like. We anticipate
0 references